steel structure workshop for Cost per square meter
The exact cost per square meter of a Steel structure workshop has always been a focus of attention for investors. Today, we will delve into the mysteries and help you plan carefully to create your ideal Steel structure workshop. When you are preparing to build a steel structure workshop, the civil engineering part is the foundation.It covers many complex processes such as foundation excavation, ground hardening, drainage system, etc., accounting for about 20% -25% of the total cost, with a cost range of approximately 100-300 yuan per square meter. A solid civil foundation is like building a "foundation" for a steel structure workshop, ensuring that it remains as solid as a rock when carrying heavy production equipment and frequent personnel movements in the future, safeguarding the safety and stability of the entire workshop.
The steel structure is undoubtedly the core component and can be regarded as the "skeleton" of the workshop. Its cost accounts for approximately 30% -35%, with a cost range of about 200-600 yuan per square meter of steel, processing fees ranging from 1000 yuan to 2000 yuan per ton, and installation fees generally accounting for 10% -20% of the total cost. From carefully selecting high-quality steel to precise cutting, welding, and assembly, every process embodies ingenuity and technology. The high-strength steel beams and columns interweave with each other, not only supporting the spacious space, but also endowing the workshop with excellent seismic performance, adapting to various complex industrial production environments.
Although fireproof coatings may seem unremarkable, they shoulder a significant mission, accounting for 5% -8% of the total cost, with a cost of about 20-50 yuan per square meter. Fire safety is crucial in industrial production. A thin layer of fireproof coating evenly covers the surface of the steel structure, like a layer of "fireproof armor" covering the workshop. It can effectively delay the spread of fire at critical moments, buy valuable time for personnel evacuation and fire rescue, and protect the safety of life and property.
The substructure accounts for 10% -15% of the cost, and the cost per square meter is about 50-150 yuan.. It includes various supports, purlins, etc. Although the volume is relatively small, its role should not be underestimated. The precisely distributed substructure ensures the stable installation of the roof and walls, making the entire workshop structure more compact and able to resist wind and rain invasion.
The proportion of doors and windows is about 8% -12%, and the cost per square meter is about 80-200 yuan. According to different functional requirements, various materials such as plastic steel and broken bridge aluminum can be selected. Windows with good lighting introduce natural light to the workshop, reducing lighting costs; Durable and sturdy doors facilitate the entry and exit of large equipment, improving production and operational efficiency.
The walls and roof are like the "coat" of the workshop, with walls accounting for 10% -15% and a cost of about 80-150 yuan per square meter. The roof accounts for 8% -12%, and the cost per square meter is about 80-150 yuan. There are various wall materials, such as color steel plates, sandwich panels, etc., which can not only provide insulation and heat insulation, but also prevent wind and rain, ensuring a comfortable and stable internal environment in the workshop; Roof materials are also key. High quality color steel tiles or metal roofs have good waterproof and drainage performance, so that even when rainstorm pours, the workshop can be safe. By understanding these proportions, you can optimize budget allocation in a targeted manner when planning a steel structure workshop.